A LSIS case study: Computer integrated manufacturing and management systems
Applications of Large Scale Industrial Systems, Volume # 1 | Part# 1
Authors
Jozef B. Lewoc; Antoni Izworski; Slawomir Skowronski
Digital Object Identifier (DOI)
10.3182/20060830-2-SF-4903.00021
Page Numbers:
118-123
Index Terms
computer aided manufacturing,management,working media,environment,control,monitoring,metallurgy,plant
Abstract
An approach to development of pioneering large scale industrial systems is described for a case study of computer integrated manufacturing and management systems. The paper presents some experience in large scale systems and the current state of art for the domain. A feasible approach is proposed, based on prospective user expectations and the system development with use of so called first thread on which the standards facilitating development of subsequent systems should be developed and people acquainted with both manufacturing and management problems should be educated. The approach proposed is particularly suitable for big metallurgical plants and IFAC seems to be a good choice for an organisation preparing the first implementation.
References
[1] Abramczyk A., Lewoc J. B. and Izworski A. (2005).
Nurse Training Case Study: e-Training of
Nurses in Diabetes problems. Nurse Education
in Practice (Elsevier), Vol. 5, Issue 2, pp. 70-77.
[2] Bieleninik E., Lewoc J. B. and Stanisz (1987). A
Communication Network of Polish University
Network, In: Technika Obliczeniowa Krajow
Socjalistycznych, No. 22 (in Russian).
[3] Blach L. K. et al. (1991) West-East Approaches of
Automation: A Case Study. In: Cultural Aspects
of Automation (IFAC), Krems.
[4] National Semiconductors (2006), Description of
QNS, Available: www.qnx.com.
[5] Doyle J. C. (1982), Analysis of feedback systems with
structured uncertainties, In: Proceedings of the
Institution of Electrical Engineers, Part D, 129,
42-50.
[6] Echelon (2006), Introduction to the LonWorks
System, Available: www.echelon.com.
[7] IASE (2002), ON-LINE ELECTRIC POWER
CONSUMPTION MONITORING AND
RECORDING SYSTEM NETPAF (v. 2) (in
Polish), Wroclaw.
[8] IBM (2006), Product Range, Available:
www.ibm.com.
[9] IBS (2006), Product Range, Available: www.ibs.se.
[10] ICL (2006), Product Range, Available: www.icl.org.
[11] Horacek P. et al. (Editors) (2005), Manufacturing
(Topic 5), In: 16th IFAC World Congress,
Prague.
[12] IFS (2006) Product Range, Available:
www.ifsworld.com.
[13] Izworski A., Lewoc J. B. and Piwowar B. (2001).
Some Aspects of Technology Transfer - A Case
Study, In: SWIIS '01 (IFAC), Vienna.
[14] Izworski A. et al. (2003a). Robust performance case
study: Topology of system Media, In: Control
Applications of Optimisation (IFAC), Visegrad.
[15] Izworski A. et al. (2003b). Approximate analytical
performance modelling of a computer integrated
manufacturing and management system. In:
Mathematical Modelling (IMACS), Vienna.
[16] Izworski A. and Lewoc J. B. (2003c), Robustness
Comparison of Enterprise Energy Distribution
[17] Systems of Various Topologies, In: Robust System
Design (IFAC), Milan.
[18] Izworski A., Lewoc J.B. and Skowronski S.
Development of Computer Integrated
Manufacturing and Management Systems. In:
Information Control Problems in Manufacturing
(IFAC), Saint Etienne.
[19] Kiejna A. and Lewoc J. B. (1988), An Exemplary
Implementation of Computer Technique for
Schizophrenia Studies, In: The European Journal of
Psychiatry, 2 No. 1.
[20] Lewoc J. and Rozent M. (1975), An Operating System
for Digital Simulator of Power Generating Unit, In:
Future progress of Electrical Engineering, Prague.
[21] Lewoc J. B. and Lanowska B. (1983), Microcomputer
Data Display System for Power Industry
Applications, In: Micro-P'83, Budapest.
[22] Lewoc J. B. (1984), A microcomputer Data Acquisition
and Retrieval System for Power Distribution
Boards, In: Microelectronics 1984, Prague.
[23] Lewoc J. B., Slusarska E. and Tomczyk A. (1989), A
Distributed Data Base for Real-Time control /
Monitoring of Power Plants, In: Distributed Data
Bases in Real-Time Control (IFAC/IFIP), Budapest.
[24] Lewoc J. B., Rozent M., Saczuk I. (1992) The computing
power and the computer systems for the power
industry in Poland, In: MICC (IFAC), Prague.
[25] Lewoc J. B. et al. (2006a), Automation, Control and
Supervision of Combined Heat and Power Systems:
A Case Study of Poland. In: International Stability
through Automation '06, Prishtina (IFAC),
(Accepted).
[26] Lewoc J. B., Izworski A. and Skowronski (2006b).
Economic, Ethical and Cultural Aspects of ICT
Change in Power System Automation: a Case Study
of Poland In: International Stability through
Automation '06, Prishtina (IFAC), (Accepted).
[27] Lewoc J. B, Izworski A. and Skowronski S. (2006c). An
Internal Internet Traffic Modelling / Performance
Measuring Tool. In: Mathematical Modelling
(IMACS). Vienna.
[28] Robertazzi T. G. (2000), Computer Network and Systems.
Queueing Theory and Performance Evaluation,
Springer-Verlag.
[29] Sawicki J., Kowalski A. J. and Lewoc J. (1974),
Implementation of the Automatic Data-Processing
for the Power System Control in Poland, In: Data -
Processing Conference, Nr 5.1.11, Madrid.
[30] Wojsznis W. and Lewoc J. (1971), Metal Flow Control
System in a Steel Mill, In: Production Process
Automation in Black Metallurgy, Publication I/33,
Zaporoze (in Russian).
